Anti-static raised floor construction process

First, the laying site requirements

1. The laying of the floor should be carried out after the indoor civil works and renovations are completed

2. The floor should be smooth, clean, dry, free of debris, and dust-free;

3. The cables, electrical appliances, air pipes, and air-conditioning systems placed under the floor shall be completed before the installation of the floor;

4. The base of heavy equipment shall be fixed and the equipment shall be installed on the base. The height of the base shall be the same as the height of the top surface of the floor;

5. The construction site is equipped with 220V/50HZ power supply and water source.

Second, floor installation tools

1. Professional cutting saw

2. Laser Level Tester

3. Blister level meter, tape measure, ink line

4. Suction plate, nut adjustment wrench, Phillips screwdriver;

5. Vacuum cleaners, files, mop;

Third, the construction steps

Grassroots Treatment and Cleaning -> Positioning the pay line -> Paste the conductive copper tape -> Mount the fixed bracket and beam -> Lay the floor of the movable floor -> Ground the static electricity -> Clean up

1. Seriously check the flatness of the ground and verticality of the wall. If it does not meet the construction requirements, it should be submitted to the relevant department of Party A;

2. Pull the horizontal line, and use the ink line to the surface of the floor to ensure the height of the floor to ensure the laying of the floor on the same level, the length of the indoor measurement, width and appropriate selection of the laying of the reference position to reduce the floor cutting, pop-up installation in the ground Bracket grid lines;

3. Adjust the brackets to be installed to the same desired height and place the brackets at the intersection of the ground grid lines;

4. Fix the cross beam to the bracket with screws, and use a horizontal ruler and a right-angle ruler to correct the crossbeam one by one so that they are in the same plane and perpendicular to each other;

5. Place the floor on the assembled beam with a suction board;

6. If the remaining size of the wall is less than the length of the floor itself, the method of cutting the floor can be patched;

7. When laying the floor, use a spirit leveler to level the block, the height of the floor is adjusted by the bracket;

8. When placing heavy equipment in the engine room, install a bracket under the floor of the equipment base to prevent deformation of the floor.

9. When the raised floor needs to cut or open holes, use an electric drill at the corner of the opening to open the 6-Ф8 round hole to prevent the surface from breaking.

Fourth, floor laying acceptance standards

1. The underside of the raised floor and the floor surface should be clean, free of dust and relics;

2. No scratch on the floor surface, no coating off, no damage to the edge;

3. The whole floor of the paving should be stable and firm, and there should be no swaying sensation when the staff walks on the floor. There should be no sound;

4. The edge of the floor should ensure a straight line, the dislocation of the adjacent floor is not more than 1mm;

5. The height difference between adjacent floor blocks is not more than 1mm.

V. Maintenance and use requirements

1. Use environment: The temperature of the room where the anti-static floor is laid is controlled at 15.C-35.C, and the humidity is controlled at 45%-75%RH; if the conditions of use....

2. Maintenance requirements:

(1) It is forbidden to use sharp instruments directly on the surface of the floor to prevent damage to the surface's anti-static properties and aesthetics;

(2) In the course of use, it is forbidden for personnel to jump directly from the floor to the floor, and it is forbidden to handle the equipment and bruise the floor.

(3) When moving the equipment on the movable floor, it is forbidden to directly push the equipment on the surface of the floor to scratch the floor. The correct method is to lift the equipment for transportation;

(4) When there is heavy equipment in the equipment room, the equipment should be directly placed on the ground base, and it cannot directly fall on the floor, resulting in long-term load-bearing deformation of the floor;

(5) During the maintenance of the equipment under the floor, use a suction plate to suck up the floor to operate, prohibit the use of sharp equipment disassembly;

(6) During the maintenance, the surface of the board is kept clean with a vacuum cleaner or a mop cloth. In particular, do not spray the liquid on the floor.

(7) The surface of the floor can be regularly played with anti-static wax to ensure long-term use of the floor.

If you have any questions please go to or QQ