Steel Furniture Installation Process Specification

1. Scope

This document outlines the pre-construction preparations, personnel requirements, installation procedures, and quality inspection standards for steel furniture on ships.

It applies to all types of ship installations where steel furniture is used.

2. Terms and Definitions

2.1 Floor-standing Steel Furniture – This type of furniture is fixed to the deck or base using bolts or welding.

2.2 Wall-mounted Steel Furniture – These are installed on the walls using bolts, self-tapping screws, or welding.

2.3 Ceiling-type Steel Furniture – Designed to be suspended from the ceiling of a cabin through welding and bolting methods.

3. Preparations Before Construction

3.1 Technical Data – Prior to installation, it is essential to review the layout plans and tray tables carefully. If needed, technical briefings should be conducted to ensure clarity.

3.2 Material Inspection – Check if there are any shortages in steel furniture or its supporting accessories. All steel furniture must pass quality inspections and come with a valid product certificate before being allowed into the factory. Any item that fails inspection cannot be installed aboard.

3.3 Tools and Equipment – Ensure all necessary tools such as rulers, chalk lines, squares, grinders, welding cutters, and other relevant equipment are ready before starting the installation.

4. Personnel Requirements

4.1 All construction workers must receive training in both technical knowledge and safety protocols. Only those who pass the required assessments may be assigned to work.

4.2 Welders must undergo specialized training in their field and safety practices. They must also pass an examination and hold a third-level welder qualification before being permitted to work. During operation, they must wear their official work permits at all times.

5. Additional Notes

Throughout the installation process, it is crucial to maintain clear communication between teams, follow all safety guidelines, and ensure that every step meets the required quality standards. Regular inspections should be carried out to identify and resolve any potential issues early on.

By adhering to this specification, the installation of steel furniture can be completed efficiently and safely, ensuring long-term durability and compliance with industry regulations.