Remarks on Hydropower Renovation: Key Issues for Four Major Issues in Renovation

Hydropower reconstruction is not only the first basic reconstruction project, but also the most important task of the entire project. Hydropower renovation as a hidden project in decoration, some problems are often easily "hidden."


Panda wire Pilesa water pipe

First, do a good job of positioning hydropower. According to the introduction, before the hydropower reform, the owner had better determine the model and type of home appliances he needed, the types and positions of various switches and sockets, and the location of the waterway interface, according to his actual needs and the models of various household appliances. Reserve space and make good use of hydropower. Cabinets are usually handed over to a professional cabinet company, which requires the cabinet company to provide specific design drawings, and strictly follow the design drawings to arrange the kitchen circuit, the direction of the waterway, and the specific positions of each switch and interface.

Second, the good fees are closed. Hydroelectric reform, as a covert project in home improvement, is the major source of decorative company profits. Before the hydropower reform, it is necessary to negotiate with the decoration company about the concrete water circuit and the positions of the switches, sockets, and connectors. Let the decoration company issue specific plans for hydropower reform and a detailed list of expenses. In the hydropower reform, the decoration company is required to strictly follow the hydropower reform map to avoid unnecessary waste.

Again, strong electricity, weak electricity shunted away. Connected with strong electric wires are televisions, air conditioners, water heaters and other electrical equipment. Weak electrical wires are connected to information equipment such as cable television lines, broadband lines, and telephone lines. Strong and weak wire can not only not connect, but also have to maintain a distance of at least 30 cm, so as to avoid causing current interference.

In the end, the quality is good. Hydro-electricity reconstruction is a hidden project. Once the acceptance of water and electricity is over and the paint on the wall is tiling, it is inconvenient to repair engineering problems. Therefore, in hydropower reform, we must not only pay attention to construction quality, but also need to be cautious in material selection. As for the materials needed for hydropower reform, Manager Wang of the Decoration Engineering Department recommends the adoption of some well-known national standard products, and at least there is a quality assurance on the material selection.


Hydropower renovation hidden project villa design decoration decoration company switch socket TV decoration kitchen cabinet door

Tile Roof Hook

Solar Panel,Solar Power System,Solar Energy System

Solar Roof Mount Jade Motor Co., Ltd. , http://www.nsgroundscrew.com