House Inspection Procedures

The house inspection procedures for housekeeping and house inspection matters will be well studied by the owners of the property.

House inspection procedures:

First, check the two books: the housing quality assurance book; the house use manual; the completion acceptance record form; the actual area measurement data is used to compare the area on the purchase contract (the area within the suite can be measured).

Second, do not pay fees, no sign, prior inspection room: After finding the problem, you can't pay fees or sign it. Should first repair the house, at the same time to collect evidence, to lay the foundation for the future when necessary evidence (that is, through a tape recorder, video camera or camera to adjust the date record evidence), in particular, keep their own retention, home delivery representative signing of the house inspection problem record form. Checking the total area of ​​housing: over or under 3% of the total is very common (overpayment is less, less compensation is for the owner); the area within the suite is constant, and the pool area is increased more (real estate reduction, loss Is still the owner).

Third, the house is in good condition. When signing the owner's convention and pre-property management contract after handing over the keys, they are optimistic about the terms and cannot give up their rights.

Fourth, pay a reasonable fee (property management fee [should have Municipal Price Bureau approval], etc.)

V. Temporary fees not payable: Public maintenance fund, deed tax: 1.5% + 80 yuan, to be paid when the personal real estate license is issued after the approval of the real estate license.

The special person carries out the synchronous record, fills in four copies of the home inspection sheet at last, the owner leaves a copy of the signature signed by the representative of the room.

First, look at the exterior: exterior facades, exterior wall tiles and coatings (note the internal wall leakage at the waistline), unit doors (appearance and trial), corridors (width, handrails, steps, screens).

Second, check the interior: entrance door, door, window, ceiling, wall, floor, wall yin and yang angle, wall tiles, floor tiles, upper and lower water, waterproof storage, heating, gas, ventilation, lighting, smoke (kitchen) , exhaust (bathroom), strong and weak power distribution boxes, strong electricity: sockets, switches, lights; weak electricity: video intercom, call alarm, telephone, broadband, cable TV.

Third, after the adjacent test: Closed water test, water meter idling and other issues must be upstairs with the neighbors downstairs.


Home Inspection Tiles Windows Switch Sockets Heating Kitchen Wall Tiles Bathroom Tiles Bathroom Doors Bathroom Wall Tiles Public Bathrooms Toilets Bathroom Tiles Exterior Tiles Kitchen Tiles

CaCO3 Filler Masterbatch

Pearlescent Masterbatch Co., Ltd. , http://www.nsmasterbatch.com